Duration of Website Design and Development

 

Duration of Website Design and Development

The duration of website improvement and design largely depends on the client’s requirements regarding the type of website they need. We offer a variety of website design services, so the timeline will vary based on the size and complexity of each project. The estimated time for each type of website design is as follows

1.Medium-sized Website (Normal Business Website)

For example, small to medium-sized business websites with additional features such as service booking or form systems

Characteristics: Includes 10-30 pages with basic systems like a Content Management System (CMS)
Duration: 3-6 weeks.

Key Steps:

  • Designing more complex UI/UX.
  • Developing the website structure and implementing features.
  • Conducting usability testing.

Gray and White Minimalist Desktop Mockup Instagram Post

 

2.E-commerce Website (e.g., online shopping websites)

Characteristics: Features include a shopping cart, payment system, order management, backend system
Duration: 6-12 weeks

Key Steps:

  • Designing product-appropriate web pages.
  • Developing and integrating the payment system.
  • Testing functionality and making improvements.

close up hand holding card scaled e1735288641667

3.Large-scale Website (Custom Web Application)

For example, online education systems, social media platforms, or web applications with specialized features

Characteristics: Requires custom design and development based on specific requirements

Duration: 6 months or longer

Key Steps:

  • Conducting in-depth requirement analysis.
  • Designing complex structures and features.
  • Developing and conducting multiple rounds of testing.

freepik upload 90156

Factors Affecting the Timeline

  1. Complexity of the Website: The more features, the longer it takes
  2. Tools and Technology: Using a CMS like WordPress is faster than custom development
  3. Coordination with Clients: Delays in client responses or gathering comprehensive content can extend the timeline
  4. Team Expertise: The proficiency of the development team